Eagle Precision

Our Facilities

 

IMG_0542

Our facility is over 65,000 square feet, and is located at 5112 Evanston Avenue in Muskegon, Michigan.

OFFICE HOURS:
7:30 AM – 4:30 PM  Monday – Thursday
7:30 AM – 4:00 PM  Friday

Equipment

Note: All PDF files will open in a new window.

List last updated August 2016

EPCP Facilities

  • 60,000 Sq. Ft. Manufacturing Plant with
    14,000 Sq. Ft. Climate Controlled
  • 8,000 Sq. Ft. Warehouse Facility

Wax Injection Equipment

  • 6 MPI 20 Ton Paste Wax Injection Machines

Quality Control & Testing Equipment

  • Willson 3JR Rockwell Hardness Tester
  • Detroit Testing Machine PH-1 Brinell Hardness tester and Newage Brinell Scope
  • Full ceramic testing laboratory
  • Continuous temperature and humidity recording of shellroom and drying room environment
  • Continuous temperature recording of mold burn-out/pre-heat oven temperatures
  • Pantak HF320 X-Ray System capable of foundry-control radiographic testing of up to 2” thick steel
  • Two (2) Leco GDS-500A Spectrometers capable of analyzing ferrous and non-ferrous alloys
  • Assorted measurement equipment for dimensional inspection including pin gages, calipers, surface plates, and custom-designed gages
  • Brown & Sharpe CMM with PC-DMIS
  • Creaform ExaScan 3-D scanner with GeoMagic Inspection
  • One seat of Solidworks 3-D modeling software
  • One seat of MagmaSoft Casting Simulation Software

Cleaning & Finishing Equipment

  • 2 Ruemelin Type A, G Sand Blaster
  • 2 Wheelabrator Tumbleblast – 3 cubic Feet Capacity
  • Pangborn #55EP5 Tumble Blast Unit
  • One Ener-Pac 50 Ton Press
  • One Dake – 25 Ton Press
  • Assorted Bench Grinders and Hand Held Air Tools
  • Two double End Belt Grinders with Automatic Rise & Fall Fixtures
  • Ramco Ceramic Leech Tank
  • Techmatic Double End Rise & Fall Grinder
  • Techmatic Double End Grinder
  • Goff 6 Cubic Feet Tumbleblast
  • 200,00 BTU Hot Pressing Oven
  • AW Bell Belt Grinder

Dip & Molding Equipment

  • Two Rommco Fluidized Bed & Blower Coating Units; 30” diameter, 40” Height
  • C-Powered Ind. Model DWA 48 x 60 Autoclave Unit
  • Five Ceramic Dip Tank Systems
  • Primary Rainfall Sander
  • Climate Controlled Ceramic Drying Rooms
  • Two Pneumatic Mold Manipulators
  • Faruc Robot & Mold Conveyor System

Melting & Pouring Equipment

  • Pillar Mark VIII, 250 KW, 500 lb. & 1,000 lb. Induction Furnace
  • Pillar Mark VIII, 250 KW Power Unit with 300 lb., 500 lb., & 1000 lb. Furnaces
  • Pillar Mark VIII, 300 KW, 500 lb. & 1000 lb. Induction Furnaces
  • Seven (7) Ceramic Mold Preheat Ovens